2008-2010 Ford Super Duty 6.4L Power Stroke GlowShift Gauges Installation Guide

7 GlowShift.com © GlowShift Gauges, LLC | All Rights Reserved 2008-2010 INSTALLATION GUIDE FORD SUPER DUTY POWER STROKE 16. Connect all of the black wires using a splice connector. 17. Secure all wires with Zip Ties. 18. Route the sensor wires and boost line through the firewall and into the cab of the truck, keeping clear of any moving parts. Note: You may need to drill a hole in the firewall if there isn’t one already. It is important to use a grommet on the hole to ensure the wires are not sliced or cut on the firewall. 19. Insert the boost line into the Ferrule Fitting Adapter, thread onto the back of the gauge and tighten with a 3/8” Wrench. (Refer to diagram below) Note: Do not overtighten the Ferrule Fitting. 20. Plug the EGT Sensor Harness into the back of the EGT Gauge. (If used) 21. Splice the green signal wire from the Transmission Temperature Gauge to the green signal wire from the sensor. (If used) 22. Splice the Green signal wire from the rail pressure gauge to the Sensor signal wire from the PCM, if applicable. 23. Splice the Black wire from the rail pressure gauge to the Ground signal wire that is run from the PCM, if applicable. 24. Mount the pillar pod and factory trim assembly to the truck cab A-pillar, securing it with the factory spring clips. Note: The grab handle, bolts and screws will no longer be used. 19. 17. 22. PROPER ORIENTATION

RkJQdWJsaXNoZXIy MTIxODAy