GlowShift | 1994-1997 Dodge Ram Cummins 12v Installation Guide

1994-1997 INSTALLATION GUIDE 5 GlowShift.com © GlowShift Gauges, LLC | All Rights Reserved DODGE RAM 12V CUMMINS Preparing The Pillar Pod SECTION 5 1. Carefully remove the factory trim from the truck by pulling and releasing the spring clips. Note: This gauge pod mounts directly on top of your truck’s A-pillar using the supplied push-in clips and is not a complete replacement. 2. Place the triple pillar pod overtop of the removed factory trim. 3. Mark and drill (4) 7/32” holes and secure with the flush mount fasteners. 4. Mark and drill 3 holes using a step bit for the wiring to pass through the factory trim. 5. Wrap Teflon tape around the brass fitting on the back of the Boost Gauge, then attach the female brass fitting for the boost line using a 13mm wrench. 6. Feed the wires from each gauge into the pillar pod. 7. Insert each gauge into the pod. 8. If using a 3 Gauge Wiring Harness, attach all of the wires. 9. Connect all of the yellow wires together using a splice connector. 10. Connect all of the red wires together using a splice connector. 11. Connect all of the orange wires together using a splice connector. 12. Connect all of the black wires together using a splice connector. 13. Secure all wires with Zip Ties. 1. 2. 9.

RkJQdWJsaXNoZXIy MTIxODAy